Post Reply 
 
Thread Rating:
  • 0 Votes - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Q5 Wrongside Failures
08-09-2011, 10:25 PM (This post was last modified: 15-09-2011 07:30 PM by PJW.)
Post: #1
Q5 Wrongside Failures
Question 5.
Describe two signalling or telecommunication wrong side failures (WSFs) that occur on railway infrastructure. [6 marks]
Explain the possible consequences of each of the WSFs that you have described. [8 marks]
Describe how both procedural and technical solutions can be adopted to minimise the risk of future occurrences of each of the WSFs you have described. [11 marks]


Extremely popular question 6/8 attempts


Attached File(s)
.pdf  Q5_5521.pdf (Size: 126.33 KB / Downloads: 43)
.pdf  Q5_9533.pdf (Size: 93.73 KB / Downloads: 44)
.pdf  Q5_5472.pdf (Size: 43.93 KB / Downloads: 30)
.pdf  Q5_5524.pdf (Size: 144.54 KB / Downloads: 31)
.pdf  Q5_5411.pdf (Size: 579.88 KB / Downloads: 29)

PJW
Find all posts by this user
Quote this message in a reply
15-09-2011, 07:33 PM (This post was last modified: 15-09-2011 08:11 PM by PJW.)
Post: #2
RE: Q5 Wrongside Failures
(08-09-2011 10:25 PM)PJW Wrote:  [b]Question 5.


Attached File(s)
.pdf  Q5_5333.pdf (Size: 515.99 KB / Downloads: 27)
.pdf  Q5_4400.pdf (Size: 142.35 KB / Downloads: 23)
.pdf  Q5_5520 WSF.pdf (Size: 252.03 KB / Downloads: 29)

PJW
Find all posts by this user
Quote this message in a reply
Post Reply 


Forum Jump:


User(s) browsing this thread: 3 Guest(s)