Attempt a Written Question
17-06-2010, 08:20 PM (This post was last modified: 19-06-2010 02:15 PM by PJW.)
Post: #1
Attempt a Written Question
Several people have expressed an interest in being set some tasks to prepare for this module; whereas there have been some attempts at track calculations recently, there has been little on written questions so far this year.

I have found what I think is a good question to start off with, because it is neither extremely brief nor too wordy and covers a topic sufficiently universal that all should be able to tackle to at least a certain degree.

You are therefore invited to have a go and post your attempts here (or using the answers anonymous facility if you prefer) by 28/06/10


1994 Question 2

Identify the features of

a) power operated points and

b) lineside signals

that affect both safe operation and reliable operation of a railway. Describe the measures that you would take to ensure that they remain safe and reliable in operation.


I suggest you look at this thread and its attachments prior

You may also find that these examples give some ideas re presentational techniques

PJW
Find all posts by this user
Quote this message in a reply
03-07-2010, 07:27 AM
Post: #2
RE: Attempt a Written Question
(17-06-2010 08:20 PM)PJW Wrote:  
1994 Question 2

Identify the features of

a) power operated points and

b) lineside signals

that affect both safe operation and reliable operation of a railway. Describe the measures that you would take to ensure that they remain safe and reliable in operation.

I have had a couple of answers and so will be posting feedback at the beginning of next week- still time for any late entries...

PJW
Find all posts by this user
Quote this message in a reply
05-07-2010, 12:55 PM (This post was last modified: 06-07-2010 07:51 PM by PJW.)
Post: #3
RE: Attempt a Written Question
(03-07-2010 07:27 AM)PJW Wrote:  I have had a couple of answers and so will be posting feedback at the beginning of next week- still time for any late entries...

See attachments


Attached File(s)
.doc  Functionality Points and Signals.doc (Size: 63 KB / Downloads: 58)
.docx  1994 mod5 Q2 Power Operated points JJ.docx (Size: 1.64 KB / Downloads: 68)
.pdf  1994 mod5 Q2 Points, Signal SN.pdf (Size: 931.55 KB / Downloads: 60)
.doc  1994 mod5 Q2 Signals JJ.doc (Size: 21.5 KB / Downloads: 39)

PJW
Find all posts by this user
Quote this message in a reply
11-07-2010, 05:46 PM (This post was last modified: 11-07-2010 05:47 PM by PJW.)
Post: #4
RE: Attempt a Written Question
(05-07-2010 12:55 PM)PJW Wrote:  
(03-07-2010 07:27 AM)PJW Wrote:  I have had a couple of answers and so will be posting feedback at the beginning of next week- still time for any late entries...

See attachments

For reference I have posted a prescriptive specification for a traditional UK point machine; this gives good background for answering the first portion of the question

Also I performance specification for colour light signals.


Attached File(s)
.doc  BS 581 Point machine perscriptive spec.doc (Size: 87 KB / Downloads: 39)
.pdf  ES10062 Performance Spec of CL Signals.pdf (Size: 244.37 KB / Downloads: 40)

PJW
Find all posts by this user
Quote this message in a reply
12-07-2010, 06:53 AM
Post: #5
RE: Attempt a Written Question
Hi,

Really good stuff and thanks a ton for posting them.

Regards

JJ
Find all posts by this user
Quote this message in a reply