|
Methods of operating Single lines
|
|
01-10-2009, 10:04 PM
(This post was last modified: 31-05-2010 07:31 AM by PJW.)
|
|||
|
|||
Methods of operating Single lines
Quote:I would like to have your reply for below queries as soon as possible. I am afraid that pressures of the day job and social committments currently prevent me dedicating as much time as I might otherwise have been able to. I appreciate that the exam is imminent and there are quite a few people with their last minute queries so I simply can't address all I regret. One Train Working- No Staff and No Signaller Key Token are both mentioned in the Module 2 Study pack Glossary and the relevant UK standards are cross-referenced and these can be downloaded from the internet as described in the References section. Also if you look in the "Powerpoint" subdirectory within the module 2 Study Pack you will find that "Single Lines" ought to provide useful information You may also find other information on the internet such as http://en.wikipedia.org/wiki/Token_(railway_signalling) is useful to you PJW |
|||
|
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 3 Guest(s)



